Green Meter Price In Pakistan | Net Metering 25

Net metering allows solar energy users to sell excess electricity back to the national grid, promoting energy efficiency and financial savings. In Pakistan, this system has become increasingly popular as more households and businesses turn to renewable energy solutions.

Total cost of Installing Net Metering Connection 2025

Net metering is important if you have solar panels installed at your home, office, or other buildings. It allows you to use any extra energy your solar panels produce. For example, if your solar system makes more electricity than you need, you can sell the extra power back to the national grid.

Total cost of Installing Net Metering Connection 2025

In Pakistan, setting up net metering costs around 150,000 PKR. If you’re thinking of installing solar panels, it’s good to understand the differences between on-grid, off-grid, and hybrid solar systems first. Net metering, also called Green Meter, helps prevent energy waste and saves you money by reducing your electricity bill based on the excess units you generate. The bigger your solar system, the more electricity you can use.

Green Meter User Manual In PDF

To start net metering, your meter needs to be three-phase. If you have a single-phase meter, you’ll need to apply to WAPDA to upgrade it. WAPDA will provide a 30,000 PKR challan form to be submitted at a bank. After payment, your meter will be upgraded to three-phase.+

Green Meter For Solar Inverter Panels Wapda Share

Preparing documents from AEDB Certified will cost about 35,000 PKR. You should also budget an additional 20,000-35,000 PKR for extra costs like hiring electricians. The cost for three-phase wiring depends on the distance between your meter and the electric tower—the greater the distance, the higher the expense.

How to Apply for Net Metering in Pakistan?

Step 1: Installation of Solar Panels First, you need to have a solar system installed with a capacity of at least 5KW. Systems smaller than 5KW are not eligible for net metering.

Net Meter in Pakistan, Free classifieds in Pakistan

Eligibility for Net Metering in Pakistan Many people have solar panels, but not all have net metering because you must meet the updated government requirements.

PEL Three Phase Bi-Directional Static Energy Meter

Net Metering in Pakistan Pakistan is dealing with high electricity prices and shortages, especially during peak summer hours with frequent load-shedding. Net metering, or Green Meter, is a solution to these issues. With high electricity bills and added taxes, net metering allows people to sell excess power back to the grid, reducing their bills and sometimes earning money from the government.

To learn more about net metering, including installation, required documents, reading guidelines, and costs, read this article. You can also check your duplicate LESCO bill online for free at lescoebill.pk.

How It Works To get a Green Meter, you must apply to the relevant Disco.

After an inspection, you will receive a demand notice. Once you pay it, a three-phase Green Meter will be installed.

If you have unscheduled load-shedding, you can report it by calling the emergency number. For more details, visit our WAPDA Emergency Helpline page.

Here’s a simple explanation of how net metering works:

If you have a 5KW or 10KW solar system that produces 500 units of electricity per month, but you only use 200 units, you can sell the extra 300 units to the national grid. This amount will be deducted from your electricity bill. If you use more electricity than your system produces, the extra will be added to your bill. If your system produces more than you use, the excess will reduce your final bill.